09 Miscellaneous jobs 2008

Apart from the things mentioned in the sections above, I did a number of smaller jobs:

– Varnishing the doors


– Varnishing the hatch and instrument box

– Starting on a new electricity installation


Not ideal, but I’ll continue this winter. The panel to the left was a temporary place for the pump control…

– Rewiring and mounting of the fridge.

– …

This is what the electricity panel looks like now (2009):


The big while cover on the left is a Nasa BM-1 battery monitor.


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s