Apart from the things mentioned in the sections above, I did a number of smaller jobs:
– Varnishing the doors
– Varnishing the hatch and instrument box
– Starting on a new electricity installation
Not ideal, but I’ll continue this winter. The panel to the left was a temporary place for the pump control…
– Rewiring and mounting of the fridge.
– …
This is what the electricity panel looks like now (2009):
The big while cover on the left is a Nasa BM-1 battery monitor.